Dempsey Ridge Wind Project
Project Overview
- Universal Project Number (UPN) 0992E1E6
- Project Name Dempsey Ridge Wind Project
- Description The Dempsey Ridge 132 MW wind power project consists of the installation of 66 Gamesa G90 2.0MW turbines on approximately 7,500 acres of agricultural and grazing land. The facility will deliver power into the Southwest Power Pool (SPP) Regional Transmission Organization (RTO) with interconnection at the AEP West Sweetwater 230kV substation. The project's intent is to generate electricity from renewable sources and therefore to displace electricity that otherwise would have been procured from the grid in the absence of the Dempsey Ridge wind farm.
- Rating
- Location OK, United States (35°30'0"N 99°28'48"W)
Program Participation
EMA Project Dataroom
Public Data View
The information shown here is publicly available.
Map of Project Area
Related EINs
Vintage | Program | Credit | Symbol/EIN |
---|---|---|---|
2012 | Verified Carbon Standard | VCU | 124628D470 |
2013 | Verified Carbon Standard | VCU | 124628D461 |
2014 | Verified Carbon Standard | VCU | 124628D498 |
2015 | Verified Carbon Standard | VCU | 1246D093D5 |
2016 | Verified Carbon Standard | VCU | 1246814F38 |
2017 | Verified Carbon Standard | VCU | 1244394793 |
2018 | Verified Carbon Standard | VCU | 1245FDC833 |
2019 | Verified Carbon Standard | VCU | 12430F10B9 |
2020 | Verified Carbon Standard | VCU | 12413D6574 |
Vintage | Program | Credit | Symbol/EIN |
---|
Project Documents
Document | Document Type | Source | Date | DocName |