CECIC HKC Gansu Changma Wind Power project

Project Overview

  • Universal Project Number (UPN) 09913C83
  • Project Name CECIC HKC Gansu Changma Wind Power project
  • Description The Project is located in Yumen Town, Yumen City, Gansu Province, the People's Republic of China. The purpose of the Project is to generate electricity using wind power resources in the project region and to deliver to the Northwest China Power Grid (NWPG) which is predominated by connected fossil fuel fired power plants, especially coal fired plants. So the Project can reduce GHG emissions by replacing the electricity generated by fossil fuel fired power plants in NWPG. The Project involves the installation of 134 wind turbines with 1.5MW capacity per unit, with a total installed capacity of 201 MW. Total of 431,949 MWh clean electricity generated by the Project are expected to be delivered to the NWPG annually. Accordingly, the Project estimated can reduce GHG emissions about 430,588 tCO2 annually.
  • Rating  
  • Location Gansu, China (40°8'30"N 96°51'30"E)

Program Participation

  • Registry Assigned Project ID 3670
  • GHG Reduction Program UNFCCC Clean Development Mechanism
  • Project Type Energy industries (renewable - / non-renewable sources)
  • Methodologies Used  
  • Project Status Registered
  • Crediting Period Begin Aug 01 2011
  • Crediting Period End Jul 31 2018
  • Program Participation Data Source: UNFCCC Clean Development Mechanism
  • Registry Assigned Project ID 717
  • GHG Reduction Program Verified Carbon Standard
  • Project Type Energy industries (renewable - / non-renewable sources)
  • Methodologies Used ACM0002
  • Project Status Verified
  • Crediting Period Begin Nov 21 2009
  • Crediting Period End  
  • Program Participation Data Source: Verified Carbon Standard
  • Registry data last updated on Apr 26 2024

EMA Project Dataroom

Public Data View

The information shown here is publicly available.

Map of Project Area

Related EINs

Vintage Program Credit Symbol/EIN
2009 Verified Carbon Standard VCU 12462CA937
2010 Verified Carbon Standard VCU 12462CA928
2011 Verified Carbon Standard VCU 12462CA955
2016 Verified Carbon Standard VCU 124E623F23
2017 Verified Carbon Standard VCU 124E623F32
2018 Verified Carbon Standard VCU 12562D7DC9
2018 Verified Carbon Standard VCU 12562D7DD8
2019 Verified Carbon Standard VCU 12562D79F5
2019 Verified Carbon Standard VCU 12562D79E6
2020 Verified Carbon Standard VCU 124915FB82
2021 Verified Carbon Standard VCU 12531015A0
Vintage Program Credit Symbol/EIN
2011 UNFCCC Clean Development Mechanism CER 12463F4865
2012 UNFCCC Clean Development Mechanism CER 12463F4892
2013 UNFCCC Clean Development Mechanism CER 12463F4883

Project Documents

DocumentDocument TypeSourceDateDocName
ER calculation spreadsheet-Changma-VCS.xls Monitoring Report Verified Carbon Standard 2020/04/09 ER calculation spreadsheet-Changma-VCS.xls
Appendix 1 - CDM-consideration Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Appendix 1 - CDM-consideration
Project Design Document Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Project Design Document
Appendix 3 - Investment Analysis Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Appendix 3 - Investment Analysis
Appendix 2 - Starting Date Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Appendix 2 - Starting Date
Appendix 5 - EF-calculation Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Appendix 5 - EF-calculation
Appendix 4 - Additional Evidences After Completeness Check Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Appendix 4 - Additional Evidences After Completeness Check
Validation Report Project Validation UNFCCC Clean Development Mechanism 2011/09/14 Validation Report
Registration Request Form Project Design and Registration UNFCCC Clean Development Mechanism 2011/09/14 Registration Request Form
Link To Information Uploaded For Public Availability Project Validation UNFCCC Clean Development Mechanism 2011/09/14 Link To Information Uploaded For Public Availability
Certification Detail
Certification Start Date End Date