Salto Pilão Hydropower Plant Project Activity

Project Overview

  • Universal Project Number (UPN) 098E6B67
  • Project Name Salto Pilão Hydropower Plant Project Activity
  • Description Salto Pilão project activity consists of the construction of a hydropower plant with a reservoir of 0.15 km2 and an installed capacity of 182.3 MW. The plant is located between the cities of Lontras, Ibirama and Apiúna, state of Santa Catarina, Southern region of Brazil. According to the project license, the geographic coordinates of the project activity are 27º06’and 27º08’S and 49º28’and 49º31’W.
  • Rating  
  • Location Santa Catarina, Brazil (27°6'0"S 49°28'0"W)

Program Participation

  • Registry Assigned Project ID 513
  • GHG Reduction Program Verified Carbon Standard
  • Project Type Energy industries (renewable - / non-renewable sources)
  • Methodologies Used ACM0002
  • Project Status Verified
  • Crediting Period Begin Jan 19 2010
  • Crediting Period End  
  • Program Participation Data Source: Verified Carbon Standard
  • Registry data last updated on Apr 26 2024

EMA Project Dataroom

Public Data View

The information shown here is publicly available.

Map of Project Area

Related EINs

Vintage Program Credit Symbol/EIN
2010 Verified Carbon Standard VCU 12465EF560
2011 Verified Carbon Standard VCU 12465EF597
2011 Verified Carbon Standard VCU 12465EF588
2012 Verified Carbon Standard VCU 1246AE9080
2013 Verified Carbon Standard VCU 1256277646
2013 Verified Carbon Standard VCU 1256277637
2014 Verified Carbon Standard VCU 124622DF96
2015 Verified Carbon Standard VCU 124605E351
2016 Verified Carbon Standard VCU 12477FA2F5
2017 Verified Carbon Standard VCU 124BC6B7E9
2020 Verified Carbon Standard VCU 125489FE81
2021 Verified Carbon Standard VCU 125489FEB7
Vintage Program Credit Symbol/EIN

Project Documents

DocumentDocument TypeSourceDateDocName
Certification Detail
Certification Start Date End Date